Tools
you will need:
Flat blade screw driver (med)
Needle-nose pliers
|
|
|
| |
|
|
Note: The
following procedure may or may not require the removal of
the inlet and or discharge hose(s) and wiring depending
on how the unit was installed.
|
|
Tip:
Operating the unit's dry bowl mode prior to removal, will help
minimize water spillage. |
| |
|
|
Macerator
Chamber
1.a)
The discharge assembly can be inspected either for restrictions or damage by
viewing through the clear view AM140 discharge inspection cover.
|
|
|
| |
|
|
|
1.b)
To remove obstructions in the macerator or inspect, pivot unit forward and remove
AM140 clear inspection cover (8 screws).
Clear
any debris from the area and reassemble. |
|
|
| |
|
|
|
Joker
Valve
To inspect, change or clear a restriction in the
C253 joker valve, remove the discharge hose fitting (90o or straight)
by removing the screws F147VT (2) on both sides of the flange.
The C253 joker valve fits inside the discharge
hose fitting.
|
|
|
| |
|
|
|
Carriage
Removal
If
necessary, the entire internal mechanism can be removed from
the bowl.
a.) Loosen coupling clamp.
b.) Remove F086VT (2) screws from both sides of the bowl.
c.) Disconnect wiring as necessary.
|
|
|
| |
|
|
|
|